Iconsa - Ingeniería Continental S.A.

Enter your keyword

Design & Contruction Of The Containment SystemErosion Protection, Bayano Hydroelectric Phase I – Access Road

Design & Contruction Of The Containment SystemErosion Protection, Bayano Hydroelectric Phase I – Access Road

EN Pavement and Infrastructure
Nombre del Proyecto:
Design & Contruction Of The Containment SystemErosion Protection, Bayano Hydroelectric Phase I - Access Road
Fecha:
March 8, 2013
Ubicación:
Planta de Bayano
Ciente:
AES
Descripción del proyecto

During the floods of December 2010, the access to Bayano plant collapsed. Facilities and workshops were destroyed and missed usable area of the riverside.

AES announces a tender bid for the referenced project, and in 2012 AES accepted our proposal which consisted of the design and construction of a containment system to the slope of the access road, which would recover the lost ground. The works were divided into two phases:

  • The Driveway Reconstruction and Canopies
  • The Containment System.

On March 8, 2013 we delivered AES the first phase of this complex work and we are preparing to develop the phase of the containment system.