Iconsa - Ingeniería Continental S.A.

Enter your keyword

Civil works for the expansion of the Thermoelectric Plant at Miraflores, Panama Canal Authority, Panama

Civil works for the expansion of the Thermoelectric Plant at Miraflores, Panama Canal Authority, Panama

EN Civil Works and Industrial
Nombre del Proyecto:
Civil works for the expansion of the Thermoelectric Plant at Miraflores, Panama Canal Authority, Panama
Fecha:
December 1, 2006
Ubicación:
Panamá
Ciente:
BWSC Panamá, S.A. (Burmeister & Wain Scandinavian Contractor A/S
Descripción del proyecto

ICONSA was hired by BWSC Panama, S.A. to execute all civil works for Panama Canal Authority’s Thermoelectric Plant expansion project (Units #7 & #8) which will increase generating capacity by 34 MW. The works were to be performed without interfering with the operation of the existing plant, and included the supply and installation on 140 vertical and battered 10” & 12” concrete piles for a total 3,200m. Other main works included excavation for structures and reinforced concrete foundations for seismic grade beams, 30m stack, generator engines, oily water separator, transformers, and slabs on grade, as well as erection of main steel structure and installation of wall and roof cladding for the new building, and drainage structures and other miscellaneous works.