Structural Rehabilitation Of The Almirante Dock Over The Medium Level Of The Sea

Structural Rehabilitation Of The Almirante Dock Over The Medium Level Of The Sea

EN Marine Projects and Deep Foundations
Nombre del Proyecto:
Structural Rehabilitation Of The Almirante Dock Over The Medium Level Of The Sea
Fecha:
March 14, 2014
Ubicación:
Changuinola, Bocas del Toro
Ciente:
Bocas Fruit Company LLC.
Descripción del proyecto

For this project, the following methods were used:

1. The conformation of the substrate – the concrete damaged by peels, cracks greater than 5mm and fissures – by scarification, the replacement of deteriorated steel and the steel protective treatment used to prolong the life of the structural elements .

2. The demolition of the damaged structural elements in their entirety, the making of steel armor with anticorrosive treatment and the discharge of the volume of demolished concrete.

3. Waterproofing treatment of the efflorescence in structural elements by pressure washing, the application of corrosion inhibitors by impregnating the surface of the epoxy coatings and chemical resistance to counteract the effect of adverse marine conditions in the site.